A/HRC/12/48
page 207
Munther Shublaq a second time at length on 14 June 2009. The Mission took photographs of the
area, and obtained plans and diagrams of the plant. Finally, the Mission addressed questions to
the Government of Israel with regard to the military advantage pursued in attacking al-Sheikh
Ejlin treatment plant, but received no reply.
963. The Gaza wastewater treatment plant is located in the coastal area south-west of Gaza
City in the al-Sheikh Ejlin neighbourhood. It was built in 1977 and expanded with support from
development cooperation. It consists of a number of installations, including offices, tanks and
lagoons to store raw sewage.
964. At some point between 3 and 10 January, a large missile hit the northernmost wall of
lagoon No. 3, causing a massive outflow of raw sewage, which travelled a distance of
1.2 kilometres and damaged 5.5 hectares of land, including agricultural land, according to
UNOSAT satellite imagery.
965. The chief of the plant, Mr. Jaoudat al-Dalou, explained to the Mission that when the
Israeli ground offensive started around 3 January, all staff left for security reasons, as did the
local residents of the sparsely populated area. Around 14 January, he received a phone call from
someone in the vicinity of the plant reporting the strike on lagoon No. 3 and the flooding of
neighbouring farmland by sewage. He contacted ICRC and PRCS to seek permission from the
Israeli armed forces to go to the plant and carry out urgent repairs. Permission was denied on the
grounds that the area was a “military zone”.
966. After the withdrawal of the Israeli armed forces, Mr. al-Dalou and his colleagues returned
to al-Sheikh Ejlin to inspect the damage. They also saw what they believed to be unexploded
bombs nearby and called the police to contact UNRWA to clear the area. Mr. al-Dalou found a
crater five metres deep on the north-east side of lagoon No. 3. The damaged wall took over four
days to repair at a cost of some US$ 158,000. More than 200,000 cubic metres of raw sewage
had flowed into neighbouring farmland.
967. In addition, a number of items, including an incubator, had been taken out of the plant and
used by Israeli soldiers to make a barricade or protection wall. The damage done by the impact
of bullets could still be seen on interior walls. Shattered windows had still not been replaced as
glass was not available. Other damaged equipment included distillation equipment (damaged
beyond repair) and a nitrogen ammonium machine.
968. In interviews with the Mission, Mr. Munther Shublaq, who issued a CMWU report of the
damage in January 2009,503 confirmed that staff had left upon the arrival of Israeli ground forces
and did not return until their withdrawal. He also indicated that on hearing news of the rupture of
lagoon No. 3 he made several unsuccessful efforts to obtain permission to access the area to stop
the damage caused by the outflow.
969. The Mission noted breaks in a large raw-sewage pipe which ran to the north of lagoon
No. 3. Plant officials suggested that clearly visible markings on the pipe had been made by tanks.
CMWU, “Damage assessment report: water and waste water infrastructure and facilities”, January 2009,
available at: http://www.cmwu.ps/upload/Damages_Assessment_for_W_WW_after_War2009.pdf.