A/HRC/16/42
upon to provide the funding to address crises have remained rigidly caught within two main
areas of engagement, i.e. ‘humanitarian assistance’ and ‘development’. Budgets for these
are not interchangeable and so the result has been an artificial separation of what should
ideally be more interconnected activities. Current funding instruments (Flash Appeals)
hardly allow for undertaking, from the start of humanitarian operations, the type of analyses
and consultations which would help reduce the margins of uncertainty and error in
resettlement, reconstruction, land tenure and the protection and realisation of the right to
adequate housing. The history of applications by development agencies for FA funding for
initiatives designed to build longer-term sustainability in humanitarian operations is a
mixed one, and the scope for accessing resources to undertake critical policy development,
legal reform and planning work has been very limited.
54.
Part of the problem is an as yet incomplete understanding of the concept of
“Recovery” (in its defined two phases of “Early” and “Long-term”) and of its programmatic
implications in the course of humanitarian assistance. The earlier conceptualization of the
transition from “relief” to “development” was not useful. The problem was that it attempted
to establish a rigid sequential logic, which tended to overlook certain essential “nonhumanitarian” actions that would need to commence from the very start of humanitarian
assistance and carry through into the resumption of normal development processes.
55.
The stakes in determining the ultimate success in ensuring equitable and efficient
reconstruction and recovery are highest in the period immediately following the initial
crisis “event”, which normally coincides with the start of humanitarian assistance. Key
determinants for ultimate success or failure in long-term reconstruction and development
are normally drawn during that early period, either through informed and proactive policy
choices, or simply by default. This applies to many areas of recovery; perhaps nowhere
more than in the area of human settlement, the right to adequate housing and land tenure. It
is a matter of concern that there is a general lack of awareness of the consequences of
overlooking key issues related to human rights and land tenure systems during the first
critical months of a response. Steps are needed to ensure that early opportunities are
recognized and utilized, in a way that protects and promotes instead of undermines the right
to adequate housing for everyone affected by conflicts and disasters. In a context of
stretched resources and huge pressure to deliver concrete results, costly policy mistakes can
be made which, particularly in the area of the right to adequate housing and land tenure, can
have serious long-term consequences. However not taking crucial necessary steps can also
have disastrous consequences.
56.
To do this requires resources from within countries, bilateral and multilateral
international donors, relief agencies and NGOs etc. With regard to post-disaster housing
challenges: “Reducing the impact of natural disasters on poorer countries is directly related
to their ability to access sufficient funding to reconstruct properly in the post-disaster
period. Post-disaster funding stimulates economic activity and restores critical components
of ongoing economic growth. The key is whether or not the country can access financing
early in the post-disaster phase of recovery57.” Once accessed, allocation and use of those
funds is also vitally important. If initial needs assessments are conducted on a competitive,
sector-driven basis, this can result in competition between agencies for “their” projects and
programmes, instead of much needed integration of forward-looking strategies. If such
inputs are well used, crises resulting from disasters can in spite of all their negative impacts
also be times of opportunity: “In post-disaster situations, intense periods of social
rearrangement can occur, and legitimacy, authority and rules are much more fluid and open
than perhaps at other times. While such situations present challenges such as low
predictability and sometimes the overlooking of safeguards on the other hand they can also
57
18
P. Freeman, “Allocation of Post-Disaster Reconstruction Financing to Housing”, in Building
Research & Information, 32(5), 2004, p. 429.
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents